Get access to your Orders, Wishlist and Recommendations
Using Tips: 1. Paving the first tile,Leave more than 2mm (use with cross spacer). Close to the tiles. 2. Insert T-shaped needle along the gap in the tile. 3. Then 180 degree rotation,T-shaped needle stuck at the bottom of the two tiles. 4. Adjust the caps with your hand/special wrench until the two tiles are on the same level. 5. About 5-6 hours after leveling, Before cement/adhesive is completely dry, rotate caps in the reverse direction, remove 180° T-needle until the word,take out. 6. Installation Effect Show.